Facade Access & BMU Systems SK-TAP-101 Suspended Facade Cleaning Platform
SEKLIFT engineers facade access systems for controlled high-rise cleaning, inspection and maintenance. Our BMU systems are coordinated around the building geometry, roof interface, access zones and operating requirements. The SK-TAP-101 facade cleaning system uses a 500 kg suspended platform, twin electric drives, galvanized wire ropes and layered safeguards for dependable building maintenance access.

- 01Pəncərə təmizliyi
- 02Fasadın yoxlanılması
- 03Birləşmə və möhürləmə işləri
- 04Üst örtüyün baxımı
- 05Yüksək mərtəbəli binaların baxımı
Facade Access Systems. One Dedicated Platform + Project-Defined Access.
BMU Systems & Building Maintenance Unit Planning
SK-TAP-101 2 m asılmış fasad təmizləmə platformasını, cüt elektrik mühərriklərini, galvaniz polad halatları, ikiqat halat sarğısını və müstəqil işləmə təhlükəsizlik vasitələrini bir əlaqəli texniki qulluq giriş sistemində birləşdirir.
Dam interfeysi, asqı quruluşu, ankraj, çıxış məsafəsi, dayanacaq və xilasetmə planlaşdırılması faktiki bina üçün mühəndislik edilməlidir.Asılmış fasad təmizləmə və baxım platforması
SEKLIFT SK-TAP-101 Facade Cleaning System
500 kq-lıq fasad təmizləmə platforması, 2 m iş platforması, ikili 1,1 kVt mühərrikləri və iki ip sarğı mexanizmi var. Onun 0,15 m/s qalxma sürəti, 8 mm-lik sinklənmiş polad ipləri və koordinasiya olunmuş təcili sistemləri yüksəkmərtəbəli binaların texniki qulluq işləri üçün nəzarətli girişi təmin edir.
- Nominal tutum
- 500 kq
- Motor gücü
- 2 × 1,1 kVt
- Üfüqi sürət
- 0.15 m/s
- Platformanın uzunluğu
- 2 m
Safety Architecture. Protected Throughout Travel.
SK-TAP-101 öz enerji ilə işləyən 2 m platformasını elektromaqnitli tormozlama, ikincil ip qorunması, əyilmə monitorinqi, hərəkət hədləri, həddən artıq yüklənmə aşkarlanması və əl ilə enerji kəsildikdə endirmə proseduru ilə koordinasiya edir.
Elektromaqnit tormozu və iki blok-dayandırıcı tormoz göstərilən dayanma və ikinci dərəcəli ip-mühafizə qatını təmin edir.
Qırmızı təcili idarəetmə dayandırma funksiyasını yerinə yetirir, əl sistemi isə enerji kəsildikdən sonra nəzarətli enməni təmin edir.
14° meyl həddi, yuxarı və aşağı həddi açarları və aşırı yükləmə aşkarlanması işləmə diapazonunu izləyir.
Həsr olunmuş platforma ölçüsü fasad təmizliyi və baxım personalı üçün kompakt iş zonası təmin edir.
Göstərilən asqı spesifikasiyası 8 mm-lik, 6×19 galvanizləşdirilmiş tel halatlardan istifadə edir.
İki halat sarma qurğusu cüt sürücülü platforma konfiqurasiyası ilə koordinasiya olunur.
Təqdim olunan elektrik spesifikasiyası 380 V iş gərginliyini göstərir.
Tavan düzülüşü, asqı mövqeyi, fasad çuxurları, iş zonaları, dayanacaq və xilasetmə girişi hər bir struktur üçün koordinasiya edilməlidir.
Define the Maintenance Envelope Before Final Configuration.
The suspended platform is only one part of the final arrangement. A useful engineering review begins with the actual structure: roof plan, elevations, sections, parapet geometry, working height, façade recesses, obstacles, intended duties and the position where the equipment will be parked. These inputs establish the physical envelope that the suspension layout, support points and operating route must work within.
Coordinate Suspension Geometry with the Structure
Roof conditions determine where supporting equipment can be positioned and how the suspended platform reaches the required working zones. Parapets, setbacks, available structural space, anchorage conditions and support loads should therefore be reviewed together rather than treated as separate details. Parking position and the route used to prepare the equipment for operation also need to be considered during this stage.
Map Working Zones, Obstacles and Travel Requirements
Building elevations and section drawings help identify recesses, projections, changes in geometry and areas that require regular cleaning or inspection. The proposed arrangement should account for these conditions before the operating concept is finalized. This review also gives the project team a clearer basis for discussing working height, maintenance duties and how the platform is expected to approach each required zone.
Plan Power, Parking and Emergency Procedures Together
The supplied equipment specification states 380 V operation together with braking, travel-limit, tilt, overload and manual-lowering provisions. Their project use still has to be coordinated with the building arrangement, normal operating procedure, parking location and rescue planning. Bringing these requirements into the same review helps avoid treating mechanical, electrical and operational interfaces as unrelated decisions.
Tavan məhdudiyyətlərini, fasad zonalarını, çökəklikləri, maneələri, dayanacaq mövqeyini və xilasetmə tələblərini müəyyən edin.
Dəstək yüklərini, asqı geometriyasını, 380 V təchizatını və bina ilə giriş avadanlığı arasındakı interfeysi nəzərdən keçirin.
Tormozlama, ip mühafizəsi, əyilmə, limit və həddən artıq yüklənmə sistemləri təchiz olunan təhlükəsizlik arxitekturasını təşkil edir.
Mühəndis SK-TAP-101-i faktiki bina ətrafında yerləşdirin.
Bina fasadlarının planlarını, dam planını, kəsim eskizlərini, parapet geometriyasını, iş hündürlüyünü, texniki xidmət zonalarını, dayanacaq mövqeyini və nəzərdə tutulan vəzifələri təqdim edin ki, SEKLIFT fasad-giriş konseptini nəzərdən keçirə bilsin.